Case study · Heidenheim · 2026

From refurbishment roadmap to a completed roof refurbishment.

Energy analysis, funding strategy, roof refurbishment and site supervision – from the first assessment to the final proof of use.

Existing building · Built 1890 · Building envelope · German BEG EM

01
approx. €31,500
Final grant awarded
02
approx. €153,000
Eligible expenditure recognised
03
20 %
Funding rate, building envelope

15 % base rate + 5 % roadmap (iSFP) bonus

04
50 %
Funding rate, specialist planning & supervision

Starting point

The project began with a survey: the energy condition of this 1890 building was analysed as part of an individual refurbishment roadmap (iSFP).

A key weakness lay in the top of the building envelope. The roof structure showed increased transmission heat losses and a clear need for modernisation.

Based on this analysis, the roof refurbishment was prepared as the first concrete implementation step. EcoFuture Solutions supported the project from the energy assessment through funding strategy and application to technical supervision of the works and the final proof of use.

Location
Heidenheim · Baden-Württemberg
Year
2026
Status
Completed
Building type
Mixed-use residential building
Year built
1890
Size
approx. 1,019 m² living area
Use
6 residential + 2 commercial units

Project path

  1. Energy advisory
  2. Roadmap (iSFP)
  3. Prioritisation
  4. Funding strategy
  5. BEG application
  6. Roof refurbishment
  7. Energy supervision
  8. Evidence
  9. approx. €31,500 final grant

Insights

The project in eight images.

Multi-storey existing building during the energy-efficient roof refurbishment.
Roof build-up during works with insulation, substructure and scaffolding.
Roof structure during the energy refurbishment.
Detail areas of the new roof build-up.
Site views of the roof refurbishment.
Connection details and drainage of the refurbished roof.
Various roof views during works.
Overview of the completed roof refurbishment and funding support.

1 / 8

All images are from the actual project. Image texts are in German.

EcoFuture Solutions scope

Four phases, one continuous process.

  1. 01

    Energy analysis

    • Building survey
    • Energy assessment
    • Individual refurbishment roadmap (iSFP)
    • Prioritisation of measures
  2. 02

    Funding strategy

    • BEG EM classification
    • Eligibility review
    • Funding application
    • Roadmap bonus secured
  3. 03

    Implementation support

    • Review of technical documents
    • Support during roof refurbishment
    • On-site inspections
    • Specialist energy planning and supervision
  4. 04

    Close-out & evidence

    • Invoice and evidence review
    • Contractor documentation
    • Proof of use (Verwendungsnachweis)
    • Final grant determination

Financial impact

What the funding achieved.

Figures refer exclusively to the eligible expenditure recognised by BAFA (German BEG funding) and do not necessarily equal the total private investment of the project.

Eligible expenditure recognised
approx. €153,000
of which eligible expenditure for the roof refurbishment
approx. €150,000
of which specialist energy planning / funding process / supervision
€3,000
Final grant awarded
approx. €31,500
Remaining recognised cost after grant
approx. €121,000

Measure delivered

From existing fabric to a modernised roof build-up.

The energy-efficient roof refurbishment reduces transmission heat losses through the top of the building envelope and is a central element of the long-term refurbishment strategy. Actual consumption is influenced by use, weather and further measures on the building.

Works carried out by the appointed contractor; specialist energy planning and supervision by EcoFuture Solutions.

  • Energy-efficient roof refurbishment
  • Roof insulation
  • New or adapted roof build-up
  • Substructure
  • Connection details
  • Flat roof areas
  • Roof drainage
  • Scaffolding / safe site access
  • Technical documentation

The wider energy roadmap

Modelled overall path per iSFP – rounded forecast after implementation of all planned measures; the modelled overall potential of all measures in the roadmap, not the result of the roof refurbishment shown here.

Baseline (iSFP)

Final energy consumption
approx. 200,000 kWh/a
Energy costs
approx. €27,000/a
CO₂ equivalent
approx. 50 kg/(m²a)
Primary energy demand
approx. 230 kWh/(m²a)

Modelled target state

Final energy consumption
approx. 30,000 kWh/a
Energy costs
approx. €7,400/a
CO₂ equivalent
approx. 14 kg/(m²a)
Primary energy demand
approx. 45 kWh/(m²a)

Funding strategy does not end with the application.

The decisive work begins where planning, delivery and evidence come together.

Planning a refurbishment? Check funding first.

We combine energy analysis, funding strategy and project support – from the first assessment to the final proof of use.