Skip to content

Project · Berlin-Schöneberg

Window renovation in a multi-family building.From refurbishment roadmap to quality-assured implementation.

In a 23-unit residential building in Berlin-Schöneberg, the windows and balcony doors were upgraded step by step as part of an energy refurbishment.

EcoFuture Solutions supported the project from the individual refurbishment roadmap and funding strategy through technical preparation to quality assurance and the funding close-out.

Implementation completedBEG funding paid out

23
Residential units
1956
Year built
approx. 0.94
documented average Uw value in W/(m²K)
20 %
Funding rate
approx. €159,000
Total investment, windows and balcony doors
approx. €32,000
Project-specific funding incl. roadmap bonus
Completed
Window renovation successfully delivered
Paid out
BEG funding
Exterior view of a renovated multi-family building with balconies in Berlin-Schöneberg

Existing building

A building with clear potential.

Built in the 1950s, the building is typical of Berlin's residential stock.

Based on an energy analysis and an individual refurbishment roadmap, a step-by-step modernisation strategy was developed.

One key element: improving the energy performance of the windows and balcony doors.

  1. 01

    Existing building

    Built 1956

  2. 02

    23 residential units

    Multi-family building

  3. 03

    Roadmap (iSFP)

    strategic basis

  4. 04

    Windows

    first measure implemented

Refurbishment strategy

Not just advice.Making delivery happen.

The individual refurbishment roadmap provided the strategic basis.

The next step turned the long-term strategy into a concrete, fundable measure. EcoFuture Solutions connected:

Energy advisoryFundingTechnical planningDeliveryQuality assurance

  1. 01

    Survey & roadmap

    Assess the energy condition and structure the measures.

  2. 02

    Funding strategy

    Identify the right funding route for the window measure.

  3. 03

    Offer review

    Check contractor offers against technical and funding requirements.

  4. 04

    Application / technical project description

    Document the funding requirements technically.

  5. 05

    Implementation support

    Accompany installation and energy-relevant details.

  6. 06

    Documentation & close-out

    Structure the evidence and support the funding close-out.

Window installation from scaffolding on a multi-family building facade

Windows & building envelope

Energy efficiency is in the details.

≤ 0.95 W/(m²K)
Uw requirement for funding
approx. 0.94 W/(m²K)
Documented average Uw value

In a window renovation, quality is not decided by the product alone.

Equally important are professional installation, air-tight connections and thermal-bridge-reduced detailing within the existing building envelope.

  • Thermal protection

    High-performance windows

  • Air-tightness

    Clean connection details

  • Thermal bridges

    Connections optimised by design

  • Workmanship

    On-site inspection and documentation

New windows in a light rendered facade

BEG + roadmap bonus

Strategy that pays off.

Because the window measure was part of the individual refurbishment roadmap, the additional roadmap (iSFP) bonus could be used in this specific project.

15 %

BEG base rate, building envelope

5 %

Roadmap (iSFP) bonus

20 %

project-specific funding rate

Funding rate of the project shown. Funding conditions must always be checked for each project.

Building advisory

From strategy to the construction site.

  1. 01Roadmap & energy strategy
  2. 02Funding strategy
  3. 03Offer and plausibility review
  4. 04Technical project description
  5. 05Site and installation inspection
  6. 06Documentation & funding close-out

EcoFuture Solutions links energy advisory and funding strategy with actual delivery – so that a refurbishment recommendation becomes a technically traceable measure.

On-site project support: inspecting the new windows on the facade

Green value

What a good window renovation achieves.

  • 01Lower heat losses
  • 02Improved thermal comfort
  • 03A better-performing building envelope
  • 04Higher workmanship through site supervision
  • 05Funding used effectively
  • 06A basis for further modernisation steps
View through an open balcony door onto a planted balcony

Refurbishment is not a one-off project.It is a strategy.

The window renovation is part of the building's long-term energy development.

The individual refurbishment roadmap provides the basis for prioritising further measures and aligning them technically and economically.

From roadmap to delivery.

Planning to modernise a multi-family building?

EcoFuture Solutions combines energy advisory, funding strategy and technical implementation support for residential buildings and property portfolios.